Looking for the maximum root opening for a pile pile splice. Complete penetration bevel groove weld, 45 degree bevel, 406 mm X 9.5 mm pipe pile, metal backing ring (50 X 6). I have a pipe pile slighly out of plumb (50 mm) and would like to take up some of the offset at the splice about 4 m down.