jenaro
Civil/Environmental
- May 20, 2003
- 1
I am building a 30-story RC building. It has two big shear walls all along its height. Dimensions are: 40 cms thick, 4 m. width and free span between sucesive floors is 3.00 m.
My problem is: original design is for Nro 4 horizontal reinforcement spaced 0.25m (hooks) and the same for vertical reinforcement. I can not get this diameter any more and need to change to Nro 5 wich can be easily found now. ¿MAY I CHANGE REBAR SPACING FROM 25 CM TO 39 CM?. And, ¿wich is the maximun allowed rebar spacing here?. ¿wich code paragraph rules this?.
Thanks a lot
My problem is: original design is for Nro 4 horizontal reinforcement spaced 0.25m (hooks) and the same for vertical reinforcement. I can not get this diameter any more and need to change to Nro 5 wich can be easily found now. ¿MAY I CHANGE REBAR SPACING FROM 25 CM TO 39 CM?. And, ¿wich is the maximun allowed rebar spacing here?. ¿wich code paragraph rules this?.
Thanks a lot