bkhadori
Electrical
- Dec 18, 2007
- 5
We were taking megger readings (phase to ground and phase to phase) for an MCC before first-time energization, and the results that we're getting were below 1.0 gega ohms. All the other MCC's on site registered greater than 2.2 gega ohms for the same test. We noticed that once we start pulling out buckets one by one the megger reading started to increase. Eventually, the megger reading was greater than 2.2 gega ohms when about half of the buckets were pulled out. Do you know what could be causing this current leakage and how we can fix it? Thanks