Attached is the pdf (2 pages)
Based on metal building foundation design guide, for overturning and sliding check, you only consider the "haunch" portion.
I don't have issues with OT moment check but failing on sliding check.
How do I engage the slab as sort of tie beam so the horizontal force cancel out and I don't fail is sliding check.
I only have minimum rebar for the slab #4 or #5 @ 12"
Based on metal building foundation design guide, for overturning and sliding check, you only consider the "haunch" portion.
I don't have issues with OT moment check but failing on sliding check.
How do I engage the slab as sort of tie beam so the horizontal force cancel out and I don't fail is sliding check.
I only have minimum rebar for the slab #4 or #5 @ 12"