Triangled
Structural
- Jun 30, 2013
- 594
The HVAC curb was roofed in before the puddle welds from the deck to the new steel framing was performed.
Is there a way to complete this connection from below the deck?
It is in a region of low wind and seismicity.
Thanks!
Is there a way to complete this connection from below the deck?
It is in a region of low wind and seismicity.
Thanks!