dylansdad
Structural
- Nov 15, 2005
- 132
I was asked to perform a site visit as a contractor was renovating a hotel. The bathrooms were to receive new shower pans and upon removing flooring, etc., it was observed that some of the floor truss top chord have been compromised (in particular, one has been totally removed). I was asked if there were a generic fix for this situation as I am sure there are plenty that I did not observe. I have heard of plywood sheathing applied as a potential remedy, but I really have no idea how we can fit that into the space(s) as they exist at the present time. Also I am not sure how to "run the numbers" on this to justify a repair as noted. I would appreciate any thoughts.