tszpun
Industrial
- Oct 22, 2013
- 28
Hello experts,
We have a requirement in a client spwcification that 33KV GIS incomer has to have metering function. My question is : provided that the relay IED itself has measurement of voltage power etc..., Is there a need of separate metering panel?
We have a requirement in a client spwcification that 33KV GIS incomer has to have metering function. My question is : provided that the relay IED itself has measurement of voltage power etc..., Is there a need of separate metering panel?