Hi Engineers,
We are discussing transmission pipelines ONLY.
Please understand the design, construction and maintenance.
In design, the engineer must consider the construction and operation side also.
My experience in Pakistan and UAE suggest that by providing a minimum slopes against and with flow, the operation and maintence becomes much safer. Otherwise, the designer must preapre an operation manual with details of valve operation schedules/nr of turns to be open/close in specfic duration. The designer must produce calcuation for airvalve sizing,filling and emptying process. Check negative pressure.
By having defined low point (washouts), it will be much safer to darin the pipeline to carry out the emergency work.
Similarly, having defined high points (airvalves), it will be quick and safe to bring the pipeline in operation. Otherwise, it will take hours and might force section by section filling.
The minimum slopes are very useful when the water transmission systen is having working pressure 24 bars and having high velocity.
The design is always done with assuptions and the assuptions are modifed based on the degree of relibility.
The minimum slopes must also take care of other utilities.