Hello,
I'm trying to determine the validity of an imposed requirement for minimum FOS of 4.0 for a short length (~18"
of 1/8" od pressure line. The pressure line routes 10000 MEOP Helium gas to downstream components. The pressure vessel for the gas is designed with FOS of 2.0. The imposed FOS 4.0 requirement for pressure lines/components comes from MIL-STD-1522.
Serious cost, schedule implications involved with developing a pressure line/fitting assembly that meets the 4.0 FOS, due to bend radii vs. maintaining inside diam. of tubing. To avoid weight penalty and keep wall thicknesses reasonable to permit bend, pressure line redesign will likely result in use of a stronger (costlier) material, and application-specific manufacturing technologies (again, more cost).
Given the vessel reqmt of FOS 2.0, can someone attempt to explain the benefit of mandating a downstream pressure line/component FOS of 4? Seems to me the greater personnel hazard will be caused by vessel burst. Additional items: The system will not be transported pressurized. Personnel exposure to the pressure line system during pre-operation evolutions, after vessel pressurization, will be controlled/minimized. During such exposure, personnel protective equipment will be mandated.
Any help is appreciated,
Jim
I'm trying to determine the validity of an imposed requirement for minimum FOS of 4.0 for a short length (~18"
Serious cost, schedule implications involved with developing a pressure line/fitting assembly that meets the 4.0 FOS, due to bend radii vs. maintaining inside diam. of tubing. To avoid weight penalty and keep wall thicknesses reasonable to permit bend, pressure line redesign will likely result in use of a stronger (costlier) material, and application-specific manufacturing technologies (again, more cost).
Given the vessel reqmt of FOS 2.0, can someone attempt to explain the benefit of mandating a downstream pressure line/component FOS of 4? Seems to me the greater personnel hazard will be caused by vessel burst. Additional items: The system will not be transported pressurized. Personnel exposure to the pressure line system during pre-operation evolutions, after vessel pressurization, will be controlled/minimized. During such exposure, personnel protective equipment will be mandated.
Any help is appreciated,
Jim