mijowe
Structural
- Feb 3, 2003
- 204
I can go two years at time without detailing or drawing an overhead door support, hanging toilet partitions, vanity support, or movable partition hangers. Typically I get shops to review, I mark them up accordingly, and move on. But once in awhile I get the job where the GC RFIs looking for designs, sketches, an then more money.
That is all.
That is all.