chileheadcraig
Civil/Environmental
- Nov 15, 2002
- 50
I am doing a upgrade for an exisiting lift station with a siltation problem. It has been suggested to use a 'mix valve' design that will re-suspend the sediment when pumping begins.
Anyone have experience with this design? I've never heard of it.
Anyone have experience with this design? I've never heard of it.