cstorrar
Civil/Environmental
- Sep 25, 2008
- 6
I am analyzing a proposed culvert reinforcement solution. There is a large CMP arch pipe (7.5'x11.5') that was installed with too much fill on top of it. The proposed solution includes adding support columns in the middle of the culvert and I am charged with analyzing the effect of the culverts on the flow carrying capacity. HEC-RAS won't allow piers to be used with a culvert, any other thoughts on how to accurately model this? Thanks!