Cap07
Structural
- Mar 8, 2008
- 78
Hi,
I am wondering what is the best way to model this situation:
I have a roadside ditch which discharges into a culvert. Midway along the culvert, the slope changes from 0.5% to 1.5%. The culvert then discharges to another ditch. Should I model the culvert as two separate culverts in series?
I am wondering what is the best way to model this situation:
I have a roadside ditch which discharges into a culvert. Midway along the culvert, the slope changes from 0.5% to 1.5%. The culvert then discharges to another ditch. Should I model the culvert as two separate culverts in series?