DPAJR
Civil/Environmental
- Jul 8, 2006
- 74
I have a project where there is a large bowl shaped area in the upper reaches. There are several dry gullies that would become intermittent streams in the event of a large storm. They all lead to the same culvert. Is it appropriate to model the entire area as a single catchment/sub basin or should it be divided into separate sub basins for each potential stream bed?
Thanks
Thanks