I have to analyze a steam line which starts inside a power plant and goes to an upgrader. The power plant is designed to B31.1, but the upgrader design code is B31.3 At some point close to border I have to make code change. I'm planning to install 6 DOF anchor point at location and build line from Power Plant to the anchor to comply with B31.1 and after anchor to B31.3. Doing this will simplify and split my line into two and make analysis simple. I would provide anchor restrains to my structural group that they will design it accordingly.
Do you have any advise or any other methods I can look into?
Thanks in advance,
Curtis
I have to analyze a steam line which starts inside a power plant and goes to an upgrader. The power plant is designed to B31.1, but the upgrader design code is B31.3 At some point close to border I have to make code change. I'm planning to install 6 DOF anchor point at location and build line from Power Plant to the anchor to comply with B31.1 and after anchor to B31.3. Doing this will simplify and split my line into two and make analysis simple. I would provide anchor restrains to my structural group that they will design it accordingly.
Do you have any advise or any other methods I can look into?
Thanks in advance,
Curtis