I am evaluating the design of an existing pipe bridge (single pipe layer). Bridge is 20 feet high and 50 foot span.
Contractor did not construct foundation as per design. Instead of constructing pedestal and anchoring the column using anchor bolts, he embedded the bridge column to the bottom of the foundation rebar and poured the concrete. Footing is 2 feet in thickness.
How do I evaluate the shear and moment capacity of the embedment. Part of my scope is to determine if it is adequate to sustain the wind loads and not have concrete breakout or pull out failure. I assume anchor bolt equations are not valid in this case.
Any ideas/help is welcome.
Thanks.