jfeng810
Geotechnical
- Sep 5, 2019
- 5
Hello everyone! There currently is a temporary situation where a W column is supporting a W beam. The bottom flange of the W beam is welded to the top of the W column via a square plate and 1/4" longitudinal and transverse welds. There is a resulting Moment at the top of the column, that basically needs to be resisted by the weld. I want to check to make sure the weld is adequate to be able to check fixity of this connection. I'd like to get input to see if my logic is correct to basically multiply the weld metal strength by the section modulus. Please see attached, thanks!