bhart192
Civil/Environmental
- Feb 6, 2006
- 81
I have a exsiting monorail system ,we'er planning a special lift . I have used a recommended analysis in the past which adds 20% of the lift load as a horz. load . This lift is inside a enclosed structure ,under very controlled guidlines ,minimum speed no lateral movement.this lift is for construction related activites ,I assume the addition of the horz. component is to compensate for unknown loadings in normal use. since this is not the case I am inclined to overlook this horz, component ,the verticle lift load puts the stress levels at 1/2 that allowable ,any comments .