samjessen
Industrial
- Dec 29, 2004
- 8
Currently estimating the cost to fabricate a welded frame constructed of 1 inch square tubing. Frame members have holes and tapped holes. These are my issues : drilling and tapping is expensive. Punching is less expensive , but is there a good method for punching 1" tubing (.125 wall ) while maintaining a quality hole for tapping ? Annual volume is 1000-1200. As usual when estimating I can only make two mistakes. Bid too high and lose the job or bid to low and send money out the door with each assembly