Dear All,
Refer the attached dwg.
During the pump starting, as per the starting sequence(defined), when speed reaches the set point, discharge MOV has to open.Total MOV opening time is 35 secs. But in pumps-B & C , MOV-11 & 12 doesnt open fully. MOV stops in the half open position.Ball valve is operated by MOV.
This problem occurs only during no other pumps are running, means P1 = P2. If any one pump is running (P2 > P1) , MOV opens smoothly.
Note: (1) This problem has started after the overhauling of respective the pumps. Pump-A is not yet overhauled.
(2) P1 <20 Kg/Cm2, P2 = 50 to 70 Kg/Cm2 if pump is running.
P1 = P2 = 25 to 30 if pump is not running.
(3) If pumps are not running, means low flow in pipeline, then flow will go thru pump by-pass line (MOV-4).
Kindly give me the probable solution...
Refer the attached dwg.
During the pump starting, as per the starting sequence(defined), when speed reaches the set point, discharge MOV has to open.Total MOV opening time is 35 secs. But in pumps-B & C , MOV-11 & 12 doesnt open fully. MOV stops in the half open position.Ball valve is operated by MOV.
This problem occurs only during no other pumps are running, means P1 = P2. If any one pump is running (P2 > P1) , MOV opens smoothly.
Note: (1) This problem has started after the overhauling of respective the pumps. Pump-A is not yet overhauled.
(2) P1 <20 Kg/Cm2, P2 = 50 to 70 Kg/Cm2 if pump is running.
P1 = P2 = 25 to 30 if pump is not running.
(3) If pumps are not running, means low flow in pipeline, then flow will go thru pump by-pass line (MOV-4).
Kindly give me the probable solution...