foreng
Civil/Environmental
- Jan 9, 2003
- 87
Trying to come up with a demolition plan for a 20 year old MSE wall with severe corrosion of internal metal straps. The wall facing is wire mesh and the wall is 13m high. Looking for some advice on sequencing of demo activities or what potential issues may arise. We were thinking of removing soil from the face down to the straps, cutting straps with shears at the facing unit, and then remove facing. The process would continue along the entire length, one lift at a time.