bekks
Materials
- Mar 9, 2013
- 28
Could someone explain to me why "stress relieving" is sometimes performed after quench and tempering by the manufacturer? The material in question is 4130. I've noticed that sometimes the MTRs state a stress relief at slightly lower temperature, but similar time to the temper temperature and time. I also noticed it stated that no weld repair was completed, so that doesn't appear to be the reason. Is it because hardness values were slightly too high?