SL26
Structural
- Sep 4, 2018
- 2
I have an issue with a mud mat that I can use some advice on. I have a large mass concrete slab (50'-0" x 50'-0" x 6'-0") on a project with heavy reinforcement and a very large embed frame. we placed a 6" mud mat about 5'-0" below grade and place some 6" concrete walls on top to form a containment area that would allow us to work conveniently and to seal the subgrade. The subgrade was brought to compaction and tested prior to placing the mud mat. A shrinkage crack formed in the mud mat after all the rebar and embeds were in place (about two weeks of work). During this time we had several rain days and the containment area would fill about 18" with water. Is there a concern with water damage to the subgrade under the mud mat?