I am working on a project where concrete walls will span between drilled piers. Will not have grade beams, maybe just a mud slab to set wall forms on. There are fairly heavily loaded pilasters at the piers, supporting concrete columns above. Contractor says for this condition they like to hold the pier down a few inches and run the mud slab over the top of the pier, in order to have a more finished surface to set the forms on, since top of drilled piers are typically very rough. Has anyone seen this done before and/or have any precautions?