Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations IFRs on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Multiple Materials Assigned to Bodies 1

Status
Not open for further replies.

jmarkus

Mechanical
Jul 11, 2001
377
If I delete a body in my model and I have other bodies present with materials defined I get the message:

"Multiple Materials are assigned to bodies, Please select the one to represent the part material."

Why do I get this message and can I control whether or not it shows up?

Thanks,
Jeff
 
Replies continue below

Recommended for you

What version of NX are you running?

John R. Baker, P.E.
Product 'Evangelist'
Product Engineering Software
Siemens PLM Software Inc.
Industry Sector
Cypress, CA
Siemens PLM:
UG/NX Museum:

To an Engineer, the glass is twice as big as it needs to be.
 
Seems like you have one part with multiple bodies.
Why don't you use assemblies?

NX 7.5.5.4 with Teamcenter 8 on win7 64
Intel Xeon @3.2GHz
8GB RAM
Nvidia Quadro 2000
 
The other bodies are used as construction geometry. At some point they may have been assigned materials in order to make some estimates about various properties.

Jeff
 
The reason for the message is that an attribute is assigned to the Part file for the material assigned. Since NX allows multiple bodies, but also assumes that each part file represents a single detailed part (at least that is what is generally expected), this question is being asked simply so that the Attribute assigned to the PART file represents that Material that one would expect the part that the file represents is to be made from. It's just to help with the 'bookkeeping' as it were.

John R. Baker, P.E.
Product 'Evangelist'
Product Engineering Software
Siemens PLM Software Inc.
Industry Sector
Cypress, CA
Siemens PLM:
UG/NX Museum:

To an Engineer, the glass is twice as big as it needs to be.
 
Thanks John, that answers the why. Is there any way I can prevent it from happening? Ultimately I'm trying to write a journal and because this happens sometimes, but not all the time (dependent on the part I am working with) it "confuses" my journal.

Jeff
 
There's no way to stop you from doing this since there may be legitimate reasons for multiple material assignments which is why we ask you the question so that you can at least specify which is the 'official' material in terms of what the system should report when asked such as in a material column of a Parts List.

John R. Baker, P.E.
Product 'Evangelist'
Product Engineering Software
Siemens PLM Software Inc.
Industry Sector
Cypress, CA
Siemens PLM:
UG/NX Museum:

To an Engineer, the glass is twice as big as it needs to be.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor