Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Multiple structures in outlet structure of a detention pond

Status
Not open for further replies.

BillsSis

Civil/Environmental
Apr 3, 2015
25
Hello,
I use HEC-HMS to route water through a detention pond. To find the elevation - discharge curve, I use Excel to find the discharge relating to its relevant elevation - using the Weir or Orifice Equations as appropriate. I'm working on a detention pond that has a 4' wide by 45' long concrete flume, with a trapezoidal weir in the middle of its length. The drawing of the weir and the flume is attached to this message. How would I analyze this situation? Do I analyze the water first as its coming into the 4' wide flume? Then, use the weir formula as the water flows through the weir? If so, what numbers do I put in the weir formula?

I appreciate any and all advice.

 
 http://files.engineering.com/getfile.aspx?folder=ed4e1786-5ccf-4cd3-8ac0-b1c39f0c9792&file=flume_and_weir_0001.pdf
Replies continue below

Recommended for you

You need to route toewall>trapezoidal weir
 
Hi Twinkie,
By the greater-than sign, do you mean for me to route the water through the toewall first, then through the weir?

Thanks!
 
Thank you Twinkie. I appreciate your time and knowledge.

 
Status
Not open for further replies.

Part and Inventory Search

Sponsor