Hi All,
I need to introduce some interior pad foundations inside an existing residential remodel. What are some best practices with respect to breaking the vapor barrier?
I do not know yet if there is a vapor barrier but assuming there is, the installation of a new pad will break the barrier. Could this be sealed up during the new foundation pour say in two phases? First pour being the thickness of the new foundation. then phase 2 to include 2" of sand under new vapor barrier under the new s.o.g.?
Or is breaking the vapor barrier for such a small area (say 3x3 feet)not considered much of an issue?
Thanks all for your feedback and expertise
I need to introduce some interior pad foundations inside an existing residential remodel. What are some best practices with respect to breaking the vapor barrier?
I do not know yet if there is a vapor barrier but assuming there is, the installation of a new pad will break the barrier. Could this be sealed up during the new foundation pour say in two phases? First pour being the thickness of the new foundation. then phase 2 to include 2" of sand under new vapor barrier under the new s.o.g.?
Or is breaking the vapor barrier for such a small area (say 3x3 feet)not considered much of an issue?
Thanks all for your feedback and expertise