Chumpes
Petroleum
- Feb 23, 2016
- 208
Dear all,
i could not find the answer to my question in other threads in the forum, that's why i have to ask you the following question...
ASME
PWHT of CS (P-No 1) with thickness above 125mm as per ASME VIII div. 1 (table UCS-56-1) asks for 2 hr plus 15 min for each additional inch(25 mm) over 2 in. (50 mm)
Same as ASME VIII div.2 (table 6.8): For t_n > 125 mm: 595°C, 2 h plus 0.6 min for each additional millimeter over 50 mm
for my 262mm thickness pressure vessel to be operated in amine service, this gives PWHT holding time = 4h07min
NACE SP0472
3.4 For amine and caustic cracking services, an effective PWHT procedure shall consist of heating weldments to 635 ± 15°C (1,175 ± 25 °F) for a hold time of one hour for each 25 mm (1.0 in), or a fraction thereof, of metal thickness, with a minimum hold time of one hour.
for my 262mm thickness pressure vessel to be operated in amine service, this gives PWHT holding time = 10h30min
The problem is that we have to apply NACE SP0472 vs. amine service, but the mechanical properties cannot be achieved for such a long holding time (10h30 @635°C), and NACE states that lower temperature and longer holding time is not acceptable for stress relief for amine service.
Can I go for holding time as per ASME (much shorter) keeping temperature as per NACE (635°C) ?
Why PWHT holding times as per ASME are so much shorter that holding times as per NACE ?
thank you in advance
i could not find the answer to my question in other threads in the forum, that's why i have to ask you the following question...
ASME
PWHT of CS (P-No 1) with thickness above 125mm as per ASME VIII div. 1 (table UCS-56-1) asks for 2 hr plus 15 min for each additional inch(25 mm) over 2 in. (50 mm)
Same as ASME VIII div.2 (table 6.8): For t_n > 125 mm: 595°C, 2 h plus 0.6 min for each additional millimeter over 50 mm
for my 262mm thickness pressure vessel to be operated in amine service, this gives PWHT holding time = 4h07min
NACE SP0472
3.4 For amine and caustic cracking services, an effective PWHT procedure shall consist of heating weldments to 635 ± 15°C (1,175 ± 25 °F) for a hold time of one hour for each 25 mm (1.0 in), or a fraction thereof, of metal thickness, with a minimum hold time of one hour.
for my 262mm thickness pressure vessel to be operated in amine service, this gives PWHT holding time = 10h30min
The problem is that we have to apply NACE SP0472 vs. amine service, but the mechanical properties cannot be achieved for such a long holding time (10h30 @635°C), and NACE states that lower temperature and longer holding time is not acceptable for stress relief for amine service.
Can I go for holding time as per ASME (much shorter) keeping temperature as per NACE (635°C) ?
Why PWHT holding times as per ASME are so much shorter that holding times as per NACE ?
thank you in advance