Hi all, I'm asking if there is a difference between design procedure for piping system which may found inside some industrial facility as oil refinery or petrochemical facility and design procedure of natural gas transmission pipelines facilities as metering stations.
note that, I don't asking about code requirements, I know they will be different in two cases, but I'm asking about the steps of design and the drawings should be made (as PFD, P&ID)
thank you in advance
note that, I don't asking about code requirements, I know they will be different in two cases, but I'm asking about the steps of design and the drawings should be made (as PFD, P&ID)