weldor
Industrial
- Apr 13, 2002
- 4
When a Contractor that holds an "R" stamp and normally preforms their own welding, subcontracts out the welding (due to their customer requesting a process that they have no Procedure for or knowledge of, how is it handled from a code stand point?
This is a repair of a Routine Nature per the National Board Inspection Code being done on a Power Boiler within the State Of Wisconsin.
Under Whose Code Stamp is the work preformed?
Who is responsiable for the documentation, paper work and or Reports?
Any input on this subject would be appreciated.
Thanks,
Weldor
This is a repair of a Routine Nature per the National Board Inspection Code being done on a Power Boiler within the State Of Wisconsin.
Under Whose Code Stamp is the work preformed?
Who is responsiable for the documentation, paper work and or Reports?
Any input on this subject would be appreciated.
Thanks,
Weldor