-
1
- #1
Isimbard
Mechanical
- Dec 13, 2000
- 6
ANY SUGGESTIONS ON NDT TECHNIQUES FOR CHECKING OUT OPERATINAL PRESSURE VESSELS RUNNING AT 300 - 350 CENTIGRADE.
THE VESSELS ARE IN OPERATION IN A REFINERY AND WE CANT TAKE THEM OUT OF SERVICE AT PRESENT.
WE WISH TO CHECK FOR CRACK PROPAGATION AND SHELL THICKNESS.
THE VESSELS ARE IN OPERATION IN A REFINERY AND WE CANT TAKE THEM OUT OF SERVICE AT PRESENT.
WE WISH TO CHECK FOR CRACK PROPAGATION AND SHELL THICKNESS.