hydrogirl
Mining
- May 12, 2004
- 7
Can fuses on a 24.9kV line satisfy the requirements of the NEC 230.204 code? Here is the setup:
250 Hp 3P/60H/4160V motor with motor controller and a 4160V/24.9kV 300KVA padmount transformer
Thanks in advance for any help on this.
Sherry
250 Hp 3P/60H/4160V motor with motor controller and a 4160V/24.9kV 300KVA padmount transformer
Thanks in advance for any help on this.
Sherry