It is true that the Base Civil Engineer is the AHJ on the base. The NEC does limit the "setback" to 1/4", as has been pointed out in this thread. However, AF standards/regs such as UFCs, AFIs, ETLs, and TOs often dictate overkill, whereas the NEC is always the minimum. Working on an AFB myself (civilian), in CE, I'm willing to bet, if asked, the BCE Project coordinator would be happy to share information with you if asked.