See attached photographs for a picture of what we encountered during a safety inspection.
The temporary power distribution panels were found during an area safety inspection. I am not an electrician, but at least 2 of the 3 don't look right to me. Temp Power2 may be ok in that at least the cord connectors are twist lock connectors. Temp Power1 and Temp Power3, I believe, do not comply with any code or standard. Temp Power1 has surface mounted receptacle boxes used as the cord connector, Temp Power 3 is using standard 120v cord connectors.
Before I pursue this further, I would like to read your opinions either supporting or refuting my initial impressions.
The temporary power distribution panels were found during an area safety inspection. I am not an electrician, but at least 2 of the 3 don't look right to me. Temp Power2 may be ok in that at least the cord connectors are twist lock connectors. Temp Power1 and Temp Power3, I believe, do not comply with any code or standard. Temp Power1 has surface mounted receptacle boxes used as the cord connector, Temp Power 3 is using standard 120v cord connectors.
Before I pursue this further, I would like to read your opinions either supporting or refuting my initial impressions.