ETIcorp
Structural
- Apr 15, 2006
- 1
I am starting to get low 7 and 28 field break. The labs for the same sets are at times 50% more than the fields. All the slumps and air are within specs. The initial curing is being done correct. Transportaion is correct (box is padded,cylinders are capped during trip, trip is less than 4 hours) The contractor blames the fact that we just recently switched to 4x8s from 6x12s. I have plenty of data from other jobs over the past 1 1/2 years since the switch where the fields are making full strenght. I am at a lose here, any help would be appreciated.