pwrengrds
Electrical
- Mar 11, 2002
- 232
Is a site required to report to NERC if the protection system would not have operated if there was a fault? The equipment is tied to the bulk electrical system that would not have operated if there was a fault, fortunately no fault happened and it was found and corrected (relay programming miss-assigned outputs from construction). If it miss operated it's required to report, but if it's found that it would not have worked and didn't miss operate, are you required to report? I haven't found anything that says it's required and would appreciate your knowledge.