bg_1735
Electrical
- Aug 7, 2017
- 6
Hi,
I would like to know if there is any sub-registration of energy if a network meter (12S/25S)is installed
in a bank of meters or meter socket that is being fed from a single phase transformer, 240/120 V.
The normal meter form for a 240/120 V service is a 2S meter, but for some reason someone installed a network meter.
The socket has the 5th jaw/pin, so the network meter is getting the neutral reference, but instead of receiving 208/120 V from a
3 phase transformer bank, it's receiving 240/120 V from a single phase transformer.
Regards.
I would like to know if there is any sub-registration of energy if a network meter (12S/25S)is installed
in a bank of meters or meter socket that is being fed from a single phase transformer, 240/120 V.
The normal meter form for a 240/120 V service is a 2S meter, but for some reason someone installed a network meter.
The socket has the 5th jaw/pin, so the network meter is getting the neutral reference, but instead of receiving 208/120 V from a
3 phase transformer bank, it's receiving 240/120 V from a single phase transformer.
Regards.