Hello,
I haven't done a lot of concrete design and have a very basic question. I have a new concrete beam that is framing into the existing beam and we used #5 bar with HILTI HY200 embedment depth 6" into the existing beam to develop that connection. Now something happened in the field and the contractor messed up that connection and I am evaluating to see if that bar can still work.
Please see the attached sketch. I have found the moment in that beam splice and also the tension that the bar is going to take. Now I want to check if that beam splice works or not. I have already checked that that bar with that much embedment is able to take that much tension and wanted to confirm if that's the only check I needed to do or is there any other check I am missing.
New slab thickness is 13" and the existing slab is 5". I found the moment at the break-in point considering a simple span beam.
Thanks
CG
I haven't done a lot of concrete design and have a very basic question. I have a new concrete beam that is framing into the existing beam and we used #5 bar with HILTI HY200 embedment depth 6" into the existing beam to develop that connection. Now something happened in the field and the contractor messed up that connection and I am evaluating to see if that bar can still work.
Please see the attached sketch. I have found the moment in that beam splice and also the tension that the bar is going to take. Now I want to check if that beam splice works or not. I have already checked that that bar with that much embedment is able to take that much tension and wanted to confirm if that's the only check I needed to do or is there any other check I am missing.
New slab thickness is 13" and the existing slab is 5". I found the moment at the break-in point considering a simple span beam.
Thanks
CG