ali07
Structural
- Dec 6, 2007
- 171
Hi Guys,
I have a situation where client need to install second escalator beside existing. I need to know how the connection works. Beam is 60ft span and i don't know whether it has to chip for some distance or not to make top flush with floor finishes. Any practical guidance is appreciated. Thanks
I have a situation where client need to install second escalator beside existing. I need to know how the connection works. Beam is 60ft span and i don't know whether it has to chip for some distance or not to make top flush with floor finishes. Any practical guidance is appreciated. Thanks