I have an existing slab-on-beam system that requires new MEP openings through the floor slab. We are looking at 6 - 5" dia openings in one row. The slab layout and opening location are shown in the image attached. I have created a FE model and have the localized bending moment and shear values. I want to avoid having to reinforce the slab and rely on the existing reinforcing bar.
My question is how far should I be distributing the concentrated forces around the openings? Are there any guidelines in the Canadian or American code? The existing slab works if I distribute the forces at least up to 500mm wide strip. Note that the slab is only 4.5" thick.
I have an existing slab-on-beam system that requires new MEP openings through the floor slab. We are looking at 6 - 5" dia openings in one row. The slab layout and opening location are shown in the image attached. I have created a FE model and have the localized bending moment and shear values. I want to avoid having to reinforce the slab and rely on the existing reinforcing bar.
My question is how far should I be distributing the concentrated forces around the openings? Are there any guidelines in the Canadian or American code? The existing slab works if I distribute the forces at least up to 500mm wide strip. Note that the slab is only 4.5" thick.