Pump2005
Civil/Environmental
- Jan 14, 2006
- 72
I am looking for a listing of steps for disinfecting a new water main installation. I work in NJ and would like to find a standard that applies to NJ. I'm okay with the 24hr chlorination period but after flushing the new main after that period and achieving a system level residual is the coliform test taken then or does the main have to sit again?