Zulak
Structural
- Mar 29, 2001
- 55
I've been asked to do a preliminary design on a new 9-story building in Manhattan. The building footprint is only 4000sf. My initial tendency is to use a structural steel frame, but the client had been led to believe that a concrete frame would be cheaper and faster to build. I personally don't see how it could be built faster than a steel frame, but NYC is a funny place. Does anybody have any experience in this area?