Dear All,
We have a situation where our customer has specified the area of operation for a Storage Tank Deluge System for exposure protection without including the area for rundown i.e. the area of coverage to which the design density is applied is calculated by the area covered by the Spray Pattern of the Nozzles.
My questions are...has anyone else come across this interpretation of the code? and is this a correct interpretation?
We have always applied the design density to the entire surface area of the Tank.
Comments/thoughts would be appreciated.
Thanks
Dave
We have a situation where our customer has specified the area of operation for a Storage Tank Deluge System for exposure protection without including the area for rundown i.e. the area of coverage to which the design density is applied is calculated by the area covered by the Spray Pattern of the Nozzles.
My questions are...has anyone else come across this interpretation of the code? and is this a correct interpretation?
We have always applied the design density to the entire surface area of the Tank.
Comments/thoughts would be appreciated.
Thanks