Can someone please advise if the requirement to increase the area of operation by 30% is applicable to Single Interlock Pre Action Systems?
I can see from the Code that it is a clear requirement for Dry Pipe and Double Interlock.
My application is a non storage environment and the deterction devices are rate of rise heat detectors and flame detectors.
Thanks
Dave