Hello everyone,
I’m looking to calculate the number of single nitrogen cylinders required to carry out a leak detection test on pipe(volume of 14m3)
The leak test pressure is 1485 psig
Nitrogen cylinder -> 6m3 / 2175.5psi
I’m struggling with the fact the bottles will begin to equalize with the test segment meaning it’s not as simple as I first thought. I believe I need to calculate how much gas is in a cylinder between the delivery and test pressure (useable volume)
Any help would be appreciated.
Many Thanks
I’m looking to calculate the number of single nitrogen cylinders required to carry out a leak detection test on pipe(volume of 14m3)
The leak test pressure is 1485 psig
Nitrogen cylinder -> 6m3 / 2175.5psi
I’m struggling with the fact the bottles will begin to equalize with the test segment meaning it’s not as simple as I first thought. I believe I need to calculate how much gas is in a cylinder between the delivery and test pressure (useable volume)
Any help would be appreciated.
Many Thanks