RK Sriwastav
Civil/Environmental
Hi all,
I have been doing pushover analysis with the plastic hinge definition as per ASCE 41:13. The model is distributed mass OMRF model. 6 storied, 4x4 bay with 5mx5m bay width, 3.5m storey height.
I have uploaded the SAP file.
The problem is " I am getting a lot of null steps and only 3 out of 100 steps are getting saved". I think there is some convergence issue but i unable to solve it by trial and error. Please help me to crack this.
Thanks in Advance.
Ravi K
I have been doing pushover analysis with the plastic hinge definition as per ASCE 41:13. The model is distributed mass OMRF model. 6 storied, 4x4 bay with 5mx5m bay width, 3.5m storey height.
I have uploaded the SAP file.
The problem is " I am getting a lot of null steps and only 3 out of 100 steps are getting saved". I think there is some convergence issue but i unable to solve it by trial and error. Please help me to crack this.
Thanks in Advance.
Ravi K