Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Non-Convergence Issue in Pushover Analysis

Status
Not open for further replies.

RK Sriwastav

Civil/Environmental
Oct 17, 2017
56
IN
Hi all,

I have been doing pushover analysis with the plastic hinge definition as per ASCE 41:13. The model is distributed mass OMRF model. 6 storied, 4x4 bay with 5mx5m bay width, 3.5m storey height.
I have uploaded the SAP file.

The problem is " I am getting a lot of null steps and only 3 out of 100 steps are getting saved". I think there is some convergence issue but i unable to solve it by trial and error. Please help me to crack this.

Thanks in Advance.




Ravi K
 
 https://files.engineering.com/getfile.aspx?folder=5c8e965c-bce7-4ab4-8f2e-f0cab2d3aea4&file=Pushover_analysis_5x5.sdb
Replies continue below

Recommended for you

Can you confirm that the control joint is on the upper floor?

Jason McKee
proud R&D Manager of
Cross Section Analysis & Design
Software for the structural design of cross sections
Moment Curvature Analysis
Interaction Diagrams
Reinforcement Design etc.
 
Yes,Jason McKee, The control point is upper floor.

Ravi K
 
Whenever i conduct some pushover analysis in SAP2000, the result do not converge. Only in few cases, I can complete the analysis with any problem. What may be the problem behind this ?

Ravi K
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top