gswarup
Civil/Environmental
- May 6, 2013
- 7
Hi,
I am doing a non linear time history analysis of 2D RC frame building in SAP2000, I've prepared a nonlinear model with NL-Link and analysed for an arbitrary sine function and got some result. However I am confused whether my modelling is correct or not. I am attaching the SAP model. Kindly anyone can guide me about my modelling?
Thanks in advance.....
I am doing a non linear time history analysis of 2D RC frame building in SAP2000, I've prepared a nonlinear model with NL-Link and analysed for an arbitrary sine function and got some result. However I am confused whether my modelling is correct or not. I am attaching the SAP model. Kindly anyone can guide me about my modelling?
Thanks in advance.....