wirty91
Civil/Environmental
- Jun 20, 2015
- 2
Hello,
I have been trying to solve with SAP2000 failure mode of planar steel frame under El Centro 1940 earthquake. Static live load on the frame is 2,5kN/m^2.
My problem is this, that when I run nonlinear analysis, I'm not able to produce any plastic hinges. Even I scale El Centro earthquake with 1000 I still don't manage to produce plastic hinges which is actually little bit strange... My task is to find failure mode of this moment frame and of course I want the hinge to be formed to the beam. I have assigned hinges to columns and beams (relative distance 0 and 1).
I have attached few pictures about my project. I'm really stuck and I don't know anymore what I should do to get this to work. Do you know what I'm doing wrong?
Frame information:
Time History function:
Gravity:
Time History in X-direction:
I have been trying to solve with SAP2000 failure mode of planar steel frame under El Centro 1940 earthquake. Static live load on the frame is 2,5kN/m^2.
My problem is this, that when I run nonlinear analysis, I'm not able to produce any plastic hinges. Even I scale El Centro earthquake with 1000 I still don't manage to produce plastic hinges which is actually little bit strange... My task is to find failure mode of this moment frame and of course I want the hinge to be formed to the beam. I have assigned hinges to columns and beams (relative distance 0 and 1).
I have attached few pictures about my project. I'm really stuck and I don't know anymore what I should do to get this to work. Do you know what I'm doing wrong?
Frame information:
http://files.engineering.com/getfile.aspx?folder=9399382a-59f4-4f66-8a25-bb942d4f6997&file=Frame.JPG
Time History function:
Gravity:
Time History in X-direction: