The thread cut into the pipe should give 3 to 4 turns by hand into a fitting, with clean dry threads. (No tape or dope for this test.) Lots of people cut the threads too deep, and that's a bad thing. The last 3 threads cut are imperfect, so if you've got to wrench fittings on past those last threads, there's something wrong. (It could be the fitting - lots of junk out there any more, especially with 150# malleable.)
Don't wrench the joints up so fast that a lot of heat gets generated. This can happen with lazy fitters who jamb a wrench into power threaders to let the machine tighten the fittings onto the pipe.
Use the correct dope or tape for the service and size of pipe. For example, lots of Loctite products run out of gas at 300*F, making them unsuitable for most steam service. Many dopes from range of manufacturers are listed as being good for pipe up to 2".